We believe in quality.Each section of the panel passes through the inspection during every stage of manufacturing.The final testing ensures that the panel meets the excate requirements.
Major Machinery |
For fabrication and powder coating: |
• CNC turrent machine |
• Hydraulic press break |
• Hydraulic shearing machine |
• 8 tank process plan for pre-treatment of MS enclosures |
• powder coating plant with backing oven |
For Busbar work: |
• PLC based busbar processing machine ( Korean make ) |
• Hydraulic busbar bending machine |
|
Major Testing Equipments |
• 4000A loading transformer for primary injection |
• 1000A 3 phase loading transformer for primary injection |
• Test bench with following facilities |
• secondary injection up to 100A AC / DC |
• Variable Voltage: 110V - 230V - 440V AC |
• 240V - 48V - 110V DC |
• Megger HV tester for routine test |
|